"Everything up to the dry-in is on this page. Shingles wait until the roof is dry."
Tear-off and architectural shingles
Delayed
Rain through Thursday. Dry-in stays covered. Shingles start Friday morning.
14 Birch Ave. The leak was photographed inside and on the roof before anything came off. Decking is patched and the dry-in is down. Shingles are on the roof, waiting on a dry day.
Date
Mon, April 13, 2026
Time
09:40 AM
Questions & Comments
Contact the provider directly
Was that stain already in the attic, or did it start when you pulled the shingles?
The ceiling and attic photos are from Monday, before we climbed. The valley photo is from the same morning, shingles still on. The stain was already there.
Are we open to the rain tonight?
No. Dry-in is down: drip edge, ice and water, and underlayment. Those photos are on Dry-in. Shingles start Friday if it stays dry.
This is a demo job. Comments are disabled in the showcase.